Chandrayaan 3 Mission

ISRO's mission Candrayaan 2 proved to be very successful. During this mission, successfully entered Chandrayaan 2's orbital into Moon's orbit, but we lost contact with Vikram Lander while landing at South Pole of Moon, which this was a major setback for the mission and ISRO. ISRO is not going to back down from this failure. ISRO has started working on Chandrayaan 3 under the Chandrayaan program.


Indian Space Agency ISRO and Japan Space Agency JAXA are working together to make this mission a success. This mission is expected to be quite special from the previous mission. India may attempt another soft landing on the moon by the end of next year. ISRO also said that an attempt has been made to plan for Moon Soft Landing in November 2020. A high-level committee was formed to prepare a report on this mission.


Sources in the space agency of the Bangalore headquarters on this mission said, "The rover, lander and landing operations will get more focus this time and any shortcomings in the Chandrayaan-2 mission will be rectified."
                          The date for sending this mission to the moon has been set as november 2020, as it may take a long time to prepare the lander, rover, rocket and pyloids in this mission. ISRO has created 1 pannel and 3 subcommittees for Chandrayaan 3. Only Lander and Rover are to be included. Because Chandrayaan 2's orbital is still working well.


In view of the shortcomings of ISRO scientist Chandrrayaan 2, it is not lacking in its preparation so that there is no lapse of any kind. It is estimated that Chandrayaan 3 will make fewer rounds of the Earth and the Moon. In Chandrayaan 3, the legs of the lander will be made stronger so that it can land well on the moon and there is no loss if it lands fast.
               Now it is to be seen how successful Chandrayana 3 is.

Post a Comment

1 Comments

  1. I think Chandrayaan 3 mission should be completed by thinking about it. Regarding the chances of making a hasty mistake. increases.

    ReplyDelete